Sample Preparation Procedure Metadata
Overburden Drilling Management, Ottawa, Ontario (ODM) / HMC 0.25-0.5 mm fraction (2nd run)
Procedure Description
Laboratory: Overburden Drilling Management, Ottawa, Ontario (ODM)
Method: HMC 0.25-0.5 mm fraction (2nd run)
…
Sample Classification (Preparation)
- Date modified: