Dossiers publics PNRG
Informations archivées
La base de données à partir de laquelle les métadonnées du dossier public PNRG ont été extraites est unilingue et n'est pas maintenue activement. Elle contient des informations qui ne sont pas facilement disponibles ailleurs.
Dossier Public 0408
Previous OF publication(s):
Province / Territory: Manitoba
Funding Source: Federal and Provincial
Year of Collection: 1976
# Lake sites: 1368
# Stream sites: 0
Survey Area: 18769 km²
NTS Sheet(s): 054M,064P
The regional lake survey for northeast Manitoba (NTS 54M and 64P) was conducted during the summer of 1976.
This report presents analytical and statistical data for 12 elements, plus loss-on-ignition, in lake sediments from 1 368 sample sites.
Analytical Data
variable | method | detection limit | year of analysis |
---|---|---|---|
Arsenic | COL | 1 ppm | 1976 |
Cobalt | AAS | 2 ppm | 1976 |
Copper | AAS | 2 ppm | 1976 |
Iron | AAS | 0.02 pct | 1976 |
Lead | AAS | 2 ppm | 1976 |
Loss-on-ignition | GRAV | 1 pct | 1976 |
Manganese | AAS | 5 ppm | 1976 |
Mercury | CV-AAS | 10 ppb | 1976 |
Molybdenum | AAS | 2 ppm | 1976 |
Nickel | AAS | 2 ppm | 1976 |
Silver | AAS | 0.2 ppm | 1976 |
Uranium | NADNC | 0.2 ppm | 1976 |
Zinc | AAS | 2 ppm | 1976 |
- Acknowledgements:
-
The reconnaissance surveys were undertaken by the Geological Survey of Canada in conjunction with the Manitoba Department of Natural Resources under the terms of the Canada - Manitoba Subsidiary Agreement on Mineral Exploration and Development.
E.H.W. Hornbrook directed the Geological Survey of Canada activities.
Contracts for field work, sample preparation and sample analysis were let, supervised and monitored by the Geochemistry Section, Geological Survey of Canada.
- Collection:
-
Contractor and supervisor details for sample collection Category Responsible Party Contractor: Supervisor: - Preparation:
-
Contractor and supervisor details for sample preparation Category Responsible Party Contractor: Supervisor: - Analysis:
-
Contractor and supervisor details for sample preparation Category Responsible Party Contractor: Supervisor:
- Other information:
-
Lake waters were not collected.
Full acknoledgements were not available.
- Date de modification