Dossier Public 0323
Previous OF publication(s):
Province / Territory: Manitoba
Funding Source: Federal and Provincial
Year of Collection: 1975
# Lake sites: 952
# Stream sites: 0
Survey Area: 12510 km²
NTS Sheet(s): 064O
The regional lake survey for northern Manitoba (NTS 64O) was conducted during the summer of 1975.
This report presents analytical and statistical data for 12 elements, plus loss-on-ignition, in lake sediments from 952 sample sites.
Analytical Data
variable | method | detection limit | year of analysis |
---|---|---|---|
Arsenic | COL | 1 ppm | 1975 |
Cobalt | AAS | 2 ppm | 1975 |
Copper | AAS | 2 ppm | 1975 |
Iron | AAS | 0.02 pct | 1975 |
Lead | AAS | 2 ppm | 1975 |
Loss-on-ignition | GRAV | 1 pct | 1975 |
Manganese | AAS | 5 ppm | 1975 |
Mercury | CV-AAS | 10 ppb | 1975 |
Molybdenum | AAS | 2 ppm | 1975 |
Nickel | AAS | 2 ppm | 1975 |
Silver | AAS | 0.2 ppm | 1975 |
Uranium | NADNC | 0.2 ppm | 1975 |
Zinc | AAS | 2 ppm | 1975 |
- Acknowledgements:
-
The reconnaissance surveys were undertaken by the Geological Survey of Canada in conjunction with the Manitoba Department of Mines and Energy under the terms of the Canada - Manitoba Subsidiary Agreement on Mineral Exploration and Development.
E.H.W. Hornbrook directed the Geological Survey of Canada activities.
Contracts for field work, sample preparation and sample analysis were let, supervised and monitored by the Geochemistry Section, Geological Survey of Canada.
- Collection:
-
Contractor and supervisor details for sample collection Category Responsible Party Contractor: Supervisor: - Preparation:
-
Contractor and supervisor details for sample preparation Category Responsible Party Contractor: Supervisor: - Analysis:
-
Contractor and supervisor details for sample preparation Category Responsible Party Contractor: Supervisor:
- Other information:
-
Did the Provincial Survey Participate?
Full Acknowledgements not available.
- Date de modification